SRE & Incident Response
Chaos game days
A chaos game day injects a planned failure into a test system, then checks a written hypothesis against the metrics and the team's response. A stop rule keeps the blast radius small.
What you will be able to do
- Explain what a game day should prove and how a stop rule limits the damage.
- Decide when a game day is ready to run in production.
What is in the lesson
- A real situation where this goes wrong
- How it works, step by step
- A walkthrough with commands you can run
- How it fails in production, and how to tell
- Three quiz questions with explanations
Read this lessonFree. No account needed.
More in SRE & Incident Response
- Exponential backoffAdvanced · 5 min
Exponential backoff waits longer after each failed attempt, so a struggling service gets room to recover. Jitter and attempt limits keep many clients from retrying…
- Retry budgetsAdvanced · 5 min
A retry budget caps how many retries a process can make in a time window, so an outage does not turn into a fleet-wide flood. It works with per-request caps and backoff…
- Regional failoverAdvanced · 5 min
Regional failover moves traffic from a failed region to a standby, using DNS records and health checks. The switch can be fast but still lose data or leave cached…
- Disaster recovery drillsAdvanced · 5 min
A disaster recovery drill restores a workload from its DR copy and times the result against the recovery objectives. It finds the secrets, DNS and configuration that a…
- RPO versus RTOAdvanced · 5 min
RTO is the maximum time a service can be down after a disaster, and RPO is the maximum time since the last recovery point, which bounds data loss. Both are business…
- Toil reductionAdvanced · 5 min
Toil is repetitive operational work that grows with a service and crowds out engineering. Measuring it and removing its cause, not just speeding up the chore, keeps the…